Projects / Pike / Releases

All releases of Pike

  •  01 Oct 2003 15:19
Avatar

    Release Notes:

    •  20 Dec 2002 13:43
    Avatar

      Release Notes: The new machine code generator makes Pike 7.4 the fastest version of Pike so far and possibly the fastest scripting language of them all. This release also introduces iterators, a foreach construct for both indices and values, greater precision in scope handling, a better Hilfe, and vastly-improved autodoc coverage. Among the new modules are XML with namespaces support, RDF, and binary relations, setting the aim for making Pike the first scripting language for the Semantic Web. Media-oriented people will be glad to see support for SDL, DVB, ID3v2, and a host of new image formats.

      •  27 Nov 2001 16:43
      Avatar

        Release Notes:

        •  16 Sep 2001 03:49
        Avatar

          Release Notes: Support for MacOSX, AIX 5L, NetBSD, and Win32 was improved. Support for SSL/TLS was added. The compiler and interpreter were optimized. Support for SNMP was added. Support for Unicode was improved. Support for big5, sjis, euc, and koi8 was added. Lots of bugs were fixed.

          •  07 Apr 2001 10:00
          Avatar

            Release Notes: First release of Pike 7.2. This release contains numerous updates, please read the changelog for full details.

            •  27 Nov 2000 05:13
            Avatar

              Release Notes: Many improvements over the 0.6.x series.

              •  11 Apr 2000 14:36
              Avatar

                Release Notes: This release adds GTK Gui support, local functions, lexical scopes for lambda functions and local functions, non-crippled crypto modules, lots of new modules (CommonLog, Gettext, HTTPLoop, Java, Msql, Mysql, Odbc, Oracle, Parser, Perl, Postgres, SANE, Ssleay (requires the Ssleay library), sybase, GTK, GL, GLUT), support for many new image formats, more cleanups in the module system, much better support for wide strings, and better type checking.

                •  27 May 1999 02:40
                Avatar

                  Release Notes: Process handling has been changed to use a wait thread on Solaris and AIX. This should solve any 'pike lost track of a child' problems. Version 0.6.131 also contains many minor bugfixes and glibc2 threads does no longer hang testsuite.

                  •  14 Jan 1999 19:23
                  Avatar

                    Release Notes: Pike 0.6.110 has been moved from beta status to stable.

                    •  15 Nov 1998 13:03
                    Avatar

                      Release Notes:

                      Screenshot

                      Project Spotlight

                      episoder

                      A tool to tell you about new episodes of your favourite TV shows.

                      Screenshot

                      Project Spotlight

                      BalanceNG

                      A modern software IP load balancer.